This DNV report compares the balance of system materials and labor costs of the three different PV+storage configurations for a 100 MWac PV system that is paired with 600 MWh (6-hours) of energy storage. DNV used industry research, equipment manufacturer quotes, and its experience to calculate the capital expenses for the balance of system of each design. The report includes drawings, an itemized list of components, and a cost breakdown for each of the three PV+storage configurations that were compared. It also explains the differences between the configurations and the cost savings in Ampt fixed DC-coupled solution.

 

DNV Report Thumbnail

Complete the form below to get your copy.


image